Construction Boxscore Database is produced by Hydrocarbon Processing | HydrocarbonProcessing.com
Subscriber Login
 
 

Twitter LinkedIn

Current Boxscore Clients

Microsoftteams Image 19

 

Geimapping Promo Bxsite

News Post

Cove Point LNG export construction complete

Dominion Energy is commissioning equipment at its Cove Point natural gas liquefaction plant at Lusby, Md., and has begun processing gas (OGJ Online, Oct. 30, 2014).

The facility, integrated with Dominion’s LNG import terminal on Chesapeake Bay, is designed to handle an average 750 MMcfd of inlet gas, mostly from the Marcellus and Utica shale plays.

Pacific Summit Energy LLC, which is a US affiliate of Sumitomo Corp., and GAIL (India) Ltd. have 20-year terminal service agreements covering half the marketed capacity each.

IHI/Kiewit Cove Point, a joint venture of IHI E&C International Corp. and Kiewit Corp., handled engineering, procurement, and construction.

http://www.ogj.com/articles/2018/01/cove-point-lng-export-construction-complete.html

For subscriptions or a demo:

Ed Bramwell

Subscriptions Sales Manager

+44 20 3793 9705

For questions or to give feedback:

Thad Pittman

Senior Researcher

+1 (713) 525-4605

Download our brochure today!

 

Boxscore Online Demo


Boxscore-Now

 

Project News

 
Please read our Term and Conditions, Cookies Policy, and Privacy Policy before using the site. All material subject to strictly enforced copyright laws. © 2024 Gulf Publishing Holdings LLC.