News Post
Cove Point LNG export construction complete
Dominion Energy is commissioning equipment at its Cove Point natural gas liquefaction plant at Lusby, Md., and has begun processing gas (OGJ Online, Oct. 30, 2014).
The facility, integrated with Dominion’s LNG import terminal on Chesapeake Bay, is designed to handle an average 750 MMcfd of inlet gas, mostly from the Marcellus and Utica shale plays.
Pacific Summit Energy LLC, which is a US affiliate of Sumitomo Corp., and GAIL (India) Ltd. have 20-year terminal service agreements covering half the marketed capacity each.
IHI/Kiewit Cove Point, a joint venture of IHI E&C International Corp. and Kiewit Corp., handled engineering, procurement, and construction.
http://www.ogj.com/articles/2018/01/cove-point-lng-export-construction-complete.html
For subscriptions or a demo:
Ed Bramwell
Subscriptions Sales Manager
+44 20 3793 9705
For questions or to give feedback:
Thad Pittman
Senior Researcher
+1 (713) 525-4605
Download our brochure today!
Project News